| 
 Suzuki Grand Vitara
 + General information
 + Maintenance and lubricant
 + Heater, ventilation and conditioner
 + Steering
 + Suspension bracket
 + Wheels and tires
 + Forward driving shaft / bearing of a shaft. Oil epiploon
 + Driveshafts
 + Brake system
 + Engines
 + Fuel system
 +  System of ignition
 -  System of start
 + General description
 - Diagnostics
 Repair of the block
 Analysis
 Assembly
 Survey
 Work check
 Specifications
 Type of 0.9 kV
 Necessary materials
 Special tool
 + System of release
 + Transmissions
 + Coupling
 + Transfer
 + Forward and back differentials
 + Windows, mirrors, locks and security measures. Immobilizer
 + Electric equipment
 
 
 
 | Assembly  
|  | 
It is not allowed to wash out, regulate or disassemble the shock-absorber (a clutch coupling disk). 
New bearings without lubricant were greased when were delivered as spare parts. Do not wash out a maslorastvoritel and do not grease with other lubricant substance. 
 |  
 
|  |  
| 
| 
 Check components (see Survey) and replace on new if necessary. 
 Apply lubricant (see the Starter). 
 Establish an anchor on a collar. 
 Install brushes and springs of brushes on the brush holder. 
 Install the brush holder on an anchor, squeezing out 4 brushes outside. 
 
|  | 1 — a brush 2 — a brush spring
 3 — the brush holder
 |  
 Establish a back sleeve and then a cap of a back bracket. 
 Establish a back bracket. 
 Tighten brush holder screws. 
 
|  | 1 — a back bracket 2 — brush holder screws
 |  
 Establish assembly of the obgonny coupling on a shaft - a gear wheel, paying attention to the direction of installation of a lock ring of a gear. 
 
|  | 1 — the obgonny coupling 2 — a lock ring of a gear
 3 — a persistent ring
 4 — a shaft gear wheel
 |  
 Insert assembly of a shaft into a forward casing, position of the lever.
 
|  | 1 — assembly of the lever 2 — the lever
 |  
 Establish laying so that cuts in it were combined with openings for through bolts in a forward casing. 
 Establish a plate and rubber consolidation in a forward casing. 
 
|  | 1 — laying 2 — planetary transfer
 3 — an opening for a bolt
 4 — rubber consolidation
 |  
 Apply lubricant on a ball and establish a ball in a shaft opening. 
 
 Establish a collar, an anchor, the brush holder and a back bracket in a forward casing, having combined the marks put before removal. 
 Tighten through bolts. 
 
|  | 1 — bolts 2 — assembly of a reducer
 |  
 Establish assembly of the electromagnetic switch and a protector (if is). Connect a wire (to the motor) to a switch conclusion. 
 After the end of assembly carry out a work Inspection. 
 
|  | 1 — the electromagnetic switch 2 — a protector
 |  |  |  
 | 
 
 
 
 
 
 |